Start Discovering Solved Questions and Your Course Assignments
TextBooks Included
Active Tutors
Asked Questions
Answered Questions
Client is considering building a four story dual usage flats suitable for both residential and office usage to replace an existing two story building.
Your School must show evidence of sustainability, in terms of both construction and operation.
Develop a table for the water quality parameters of surface water (rivers and lakes), and groundwater.
Sketch the water surface profiles for the cases below. Label the normal and critical depth lines as well as all of the water surface profiles.
The V-block clamp comprises of 3 components, a V-block, yoke and clamping screw. By using a rule, measure the sketches below and produce a third angle projection drawing for each component.
The circular gate can be opened (or closed) as a rotational motion about its horizontal centre line, by applying a moment on the shaft.