There is a two stage production line suppose that a job is


There is a two stage production line. Suppose that a job is sent to the first work station every 10 minutes with variance =4. The first stage work station can process a job every 5 minutes with variance =4 and the second work station can process a job every 2 minutes with variance =9. solve cycle time in the system.