The project team is required to submit a report


Project report

In Week 3 your local tutor will assign students into groups of two students to permit the group to collaborate and upload Assignment 2 as a group. To facilitate collaboration, a group wiki will be set up and must be used progressively to complete Assignment 2 (see wiki information below).

It is imperative that students complete the Activities at the end of Topic 3 in the Study Guide.

For Assignment 2,the project team is required to submit a report illustrating how the project team will apply the following knowledge areas that have been learned in this unit to Project. The Project Report needs to address the following areas at a minimum:

- WBS
- RACI Chart
- Schedule - Gantt chart and AoN as well as resource levelling
- Budget
- Progress Reporting - 2 methods
- Risk Management
- Change Management
- Communication
- Project closure

In Week 3 your local tutor will assign students to a group. A wiki will be set up within MySCU and access to each group wiki will be limited to the designated two students, the local tutor and the Unit Assessor. No other student can access your group wiki.

The wiki must be used to progressively compile the required parts of Assignment 2 - OurProject Report aligned to the PMBoK knowledge areas. It is required that students place material in the wiki on a set progressive basis. That is, students will be required to place material for example a WBS in the week following the week that the topic is taught. For example, WBS is presented in Topic 5 / Week 5, and therefore students have until the end of Week 6 (Saturday at midnight NSW time) to place material and a WBS into the wiki. If this is not in your group wiki by the applicable Saturday at midnight NSW time, then a daily penalty reduction of 10% of available marks for this particular marking criteria will commence from that time.

It is noted that there are two marking criteria for some of the PMBoK knowledge areas. It is suggested that each student take carriage of one of these elements in the wiki to ensure both are completed and placed in the wiki before the relevant time.

Just prior to the due date for Assignment 2, one student from each group should download all material from the wiki and compile these into the one single document to be uploaded via the A2 turn-it-in portal for grading. There is no need for both students to upload as this will result in 100% match in the originality score.

The maximum word length for this assignment is 4,000 words excluding words used in any charts, templates, forms or diagrams that the project team have used to apply the knowledge areas. If the project team opt to use words to explain how the team have applied a knowledge area you should limit them to one page per knowledge area.

A soft copy of many useful forms will be made available to you on MySCU that project teams can modify and use for the assignment. However a project team can and should design your own forms or use standard forms that are used by an organisation and adapt these to suit your project. The soft copy is provided for the benefit of those students who are not adept at designing forms using a computer. Hand drawn forms can be used as well but they must be neatly drawn.

You are also required to provide a list of references listing all the sources you have referred to in preparing this assignment.

Format for Assignment 2
The format of the formal assignment will be:
- SCU Cover Sheet
- Title page
- Table of contents
- Introduction
- WBS
- RACI Chart
- Schedule
- Budget
- Progress Reporting
- Risk Management
- Change Management
- Communication with Stakeholders
- Project Closure
- Reference list (Harvard referencing style is required)
- Appendix will only include a copy of the first assignment for your grader. All forms, charts, tables and diagrams should be included under the relevant sections of the assignment. The Appendix is NOT graded.

Please make this assignment as per requirement all details mention in the word file.

Use the pattern of word file for making this assignment

Attachment:- project order.rar

Request for Solution File

Ask an Expert for Answer!!
Project Management: The project team is required to submit a report
Reference No:- TGS01383141

Expected delivery within 24 Hours