Create a semiannual production plan using notional demand


Assignment

Prompt: The plan should replicate the techniques in the text and can be submitted in a basic tabular (spreadsheet) format. It must include the following:

• Estimates of labor hours consumed

• Estimated number of worker requirements considering a standard work week, current inventory levels, receipts of new inventory during each month, and varying demand levels for each month of production For service businesses that do not include inventory or raw goods for the assembly line, the inventory of the support materials/equipment or consumable materials can be used. Specifically, the following critical elements must be addressed:

• Create a semiannual production plan using notional demand and inventory.

• Estimate the labor hours consumed.

• Estimate the number of worker requirements considering a standard work, current inventory levels, receipts of new inventory during each month, and varying demand levels for each month of production

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.