Start Discovering Solved Questions and Your Course Assignments
TextBooks Included
Solved Assignments
Asked Questions
Answered Questions
q multithreaded architectureit is clear at the moment if we provide a lot of contexts to multiple threads then processors with numerous contexts are
concept of multithreading this problem rises in design of large scale multiprocessors like mpp so a solution for optimizing this latency must be
q describe about remote-load latency problemwhen one processor requires some remote loading of data from other nodes then processor has to wait for
q define synchronization latency problemif two simultaneous processes are executing remote loading then its not recognized by what time two processes
superscalar architecture was designed to increase the speed of the scalar processor but it has been realized its not easy to apply subsequent are a
q hardware required for superscalar processingfor applying superscalar processing a number of special hardware should be offered that is discussed
in scalar processors just one instruction is implemented per cycle which means just one instruction is issued for each cycle and only that one
q explain working of bit serial associative processor when associative processor accepts bit serial memory organization subsequently it is known as
q working of fully parallel associative processorfully parallel associative processor this processor accepts the bit parallel memory organisation
q purpose of customer review in project managementthe customer in conjunction with the project manager engineer decides the timing of the ifa
q purpose of internal reviewthe project engineer in consultation with affected disciplines decides the timing of an internal review of ifr issue
q explain about master stick filethe master stick file is an up-to-date version of the pampids it is not to be used as a check print by any
q what is ifc in project managementthis revision is to be used as a basis for preparing detailed design for final checking of ifc drawings by other
q what is ifd in project managementthe pampids now reflect the next intermediate stage of development and incorporate any changes requested by the
q what is issued for approvalthis initial formal issue of the pampids to the customer incorporates the process development agreed to in the approved
q what do you mean by issued for reviewthis drawing issue of pampids is a draft and is intended for the colt-internal review process involving
project quality plan design verification requirements for a project are to be established in the quality plan sub-section of the project execution
once vendor drawings are received and piping isometric drawings are prepared the mechanical engineer will provide a final stress package to the
preliminary stress analysis work will start early in the detail engineering phase after completion of equipment layout and piping study drawings the
hydraulic calculations are carried out by both process and mechanical engineering generally speaking process engineering will initiate many
q what do you mean by line designation tablesdevelopment of the line designation tables ldts is carried out in conjunction with the evolution of the
q show the types of changes in project during the development and execution of a project the following changes can occur scope of work changes cost
q resource management for projectan important factor in overall project success is the provision of suitable and adequate resources the initial
q define the project scopethe design basis memorandum defines the project scope this includes basic design concepts and the basis and philosophies
q define conceptual engineering phase for projectthe primary objective of this stage is to include and clearly define the economic feasibility of the