Bench Mark and Reduced Level
Define the term: a) Bench mark.b) Reduced level.
Define the term:
a) Bench mark.b) Reduced level.
Expert
a) Bench Mark is a surveyor’s mark out on a stone / rock or any other reference point which is used to specify a level in the levelling survey. b) Reduced Level is the level of the point with respect to the level of permanent feature or the bench mark. It shows that a point on the land is above or below the levelling point.
List the chief factors which are used for comparing Diesel, Otto and Dual cycles.
Explain the performance of piles and limit state design. Also explains its three Geo technical categories?
Causes of building collapse: The Passage of time is one cause. Buildings as well collapse due to feeble foundations. Hurricanes, Earthquakes and other natural disasters can too damage the structure of the buildings and cause it to fall down. Bombings
Describe the function of Camshaft and Crank shaft?
Write down some of the advantages of RCC.
Write down the basic requirements of the fuel injection system of Diesel Engine.
What is the purpose of a Man Hole and Grate in the Boiler?
Write down any three major testing on stones?
What are the movements and cracking in the housing superstructure?
What are the reasons to use Pile foundations during construction?
18,76,764
1954684 Asked
3,689
Active Tutors
1414520
Questions Answered
Start Excelling in your courses, Ask an Expert and get answers for your homework and assignments!!