Installation of Piles:The installation of piles is the most important aspect of any pile foundation. There may be a number of techniques available for this. There should be proper care taken in this regard. The features or characteristics which are the deciding factor to choose the installation are:
a. Pile characteristics.b. Resistance to achieve the required penetration.c. Space available at the working site.d. Disturbance due to noise.
Pile driver is the most widely used method of installing the piles. These use the dropping weight technique in which an appropriate weight is hoisted at a suitable height in a sleeve, is released to hit the pile head, and this then drives the pile in the ground. The method of dropping the weight may be single-acting dropping weight method and double-acting dropping weight method. The machine is driven by either steam; it may be hydraulic in nature or may be driven by compressed air.
How the modification in the compression ratio affects the air standard efficiency of an Ideal Otto Cycle?
Explain the single plane or multiple planes use in cable-stayed bridges?
Discuss scaling in the Boiler and its effect?
Write short note on Steam Turbines.
State the working principle of Hydroelectric Power Plant.
How thermal efficiency can be improved of gas turbine power plant.
Describe the principles of Impulse and Reaction Turbine?
What are the various factors that influencing the choice of piles during construction?
List some of the applications of Air Conditioning?
List the demerits of a Nuclear Power Plant.
18,76,764
1937587 Asked
3,689
Active Tutors
1456858
Questions Answered
Start Excelling in your courses, Ask an Expert and get answers for your homework and assignments!!