Which of the following statements about a control chart is correct?

A. If a process is in control, then no defects can be found

B. It is possible that the outcome of a process is within the control limits but outside the specification limits

C. Control limits are the same as specification limits

D. It is impossible that the outcome is outside the control limits but within the specification limits