What is the time constraints


Problem:

The operations manager for the Blue Moon Brewing Co. produces two beers: Lite (L) and Dark (D). He can only get 675 gallons of malt extract per day for brewing and his brewing hours are limited to 8 hours per day. To produce a keg of Lite beer requires 2 minutes of time and 5 gallons of malt extract. Each keg of Dark beer needs 4 minutes of time and 3 gallons of malt extract. Profits for Lite beer are $3.00 per keg and profits for Dark beer are $2.00 per keg.

Required:

Question 1) What is the time constraints? Solve the problem and show all work.