What is the minimum number of machines needed to meet demand


Problem: The King Company is producing two types of products: A and B. Both products are produced on the same machining operation. The machines operate on two 8-hour shifts, 5 days per week, and 50 weeks per year. The manager wants to maintain a 20 percent capacity cushion. The demand forecast, batch sizes, processing times, and setup times are given in the below table. What is the minimum number of machines needed to meet demand?

                                          Product A    Product B
Demand forecast (units/yr)    150,000      180,000
Batch size (units/batch)             100             40
Processing time (hr/unit)            0.3            0.15
Setup time (hr/batch)                  1               1.2

Solution Preview :

Prepared by a verified Expert
Microeconomics: What is the minimum number of machines needed to meet demand
Reference No:- TGS02012790

Now Priced at $20 (50% Discount)

Recommended (98%)

Rated (4.3/5)