What is the length of the lowest cost cyclic schedule


1. Battle Creek Cereal Company has four main products: Corn Flakes, Frosted Flakes, Bran Flakes and Strawberry Flakes. The average daily demand for the products is:

Corn Flakes: 1,225 CS

Frosted Flakes: 1,580 CS

Bran Flakes: 1,725 CS

Strawberry Flakes: 2,275 CS

2. These products are manufactured on a single assembly line with a daily production rate of 12,380 CS. It costs Battle Creek $1,260 to set up each cereal for producition and the daily holding cost for cereal is $0.01. What is the length of the lowest cost cyclic schedule (ignoring setup time constraints) in days?