Each A requires 2 units of subassembly B and 1 unit of part C. Subassembly B requires 3 units of part D. The lead time for the assembly of A is 4 days. The lead time for the assembly of B is 3 days. The lead time for the manufacture of C is 5 days and 4 days for part D. What is the cumulative lead time for A?