What is not true for reengineering planned stops include


1. What is not true for Reengineering?

a. Radical change

b. Continuous improvement

c. Need large investment

d. Is a lean tool

e. Out of box approach

2. Henry Ford is the inventor of

a. JIT

b. Kaizen

c. Assembly line

d. Reengineering

e. Waste

3. Muda means

a. Cellular production

b. Defects –free production

c. Waste- free production

d. Mass production

e. Over production

4. Planned Stops include all but

a. Preventive maintenance

b. Machine break down

c. Machine greasing

d. Operator break

e. None of the above

5. One of the reasons for a need to change the layout mentioned in the text is

a. Change in economic conditions

b. Bought a new equipment

c. Change in environment

d. Change in schedule

e. Hired new worker