What is bottleneck time


Assignment:

A production process at Kenneth Day Manufacturing is shown in Figure. The drilling operation occurs separately from, and simultaneously with, sawing and sanding, which are independent and sequential operations. A prod

a) Which operation is the bottleneck?
b) What is the bottleneck time?
c) What is the throughput time of the overall system?
d) If the firm operates 8 hours per day, 20 days per month, what is the monthly capacity of the manufacturing process?

1133_production process.JPG

Provide complete and step by step solution for the question and show calculations and use formulas.

Solution Preview :

Prepared by a verified Expert
Operation Research: What is bottleneck time
Reference No:- TGS01954299

Now Priced at $30 (50% Discount)

Recommended (97%)

Rated (4.9/5)