Then assume there are a total of 16 consulting resource


Given the following network for a stock repurchase project with outside consulting resource demands, construct a modified Gantt AOA chart with resources and a resource load diagram. suggest how to level the outside consulting load if you can plit operations.

Then Assume there are a total of 16 consulting resource units available. Using the ‘minimum slack first’ allocation rule, determine how the resources should be allocated to individual tasks to complete project as quickly as possible but without exceeding the available resources. The project duration may be extended if necessary.

Then Assume there are a total of 16 consulting resource units available. Using the ‘most resources first’ allocation rule, determine how the resources should be allocated to individual tasks to complete project as quickly as possible but without exceeding the available resources. The project duration may be extended if necessary.

197_media_cbc_cbcc64a9-5a77-441f-a8c1-e15903449b86_phplx1aLu.png

Request for Solution File

Ask an Expert for Answer!!
Operation Management: Then assume there are a total of 16 consulting resource
Reference No:- TGS01492780

Expected delivery within 24 Hours