System and application overview an overview of the system


Part 1 Tasks (Objectives from Week 1-4)

Week 1: System and Application Overview: An overview of the system or software application and intended users

Week 1: Requirements Specification: Detailed requirements specification with both functional and nonfunctional requirements

Week 2: System and Application Design: A high-level design in the form of use cases and detailed design models utilizing computer-aided software engineering (CASE) tools to represent the data, processes, and interfaces

Week 3: Test and Quality Assurance Plan: A test and quality assurance plan that included the various tests and quality control measures that need to be taken into consideration

Week 4: Development Strategy: A development strategy that weighs make versus buy or insourcing versus outsourcing acquisition strategies

Make any updates to the first 4 weeks' content based on feedback from your instructor and your peers. Make sure that the Key Assignment has a good flow and is cohesive in its presentation of information.

Part 2 Tasks (Objectives from Week 5)

In the final week, you are given the assignment to craft an integration and deployment plan for your selected application or system that includes the required resources and work breakdown structure of implementation tasks (you may use Visio Software Application where needed).

The project deliverables are as follows:

Update the System Requirements, Design, and Implementation Specification title page with the new date.

Update the previously completed sections based on the instructor's and peers' review feedback.

Integration and Deployment Plan

Develop an overall work breakdown structure (WBS) for the 7 system development life cycle (SDLC) phases:

Preliminary Analysis

System Analysis or Requirements Definition

System Design

Development

Integration and Testing

Acceptance, Installation, and Deployment

Operation Support and Maintenance

Add activities under the first 5 phases that you already performed in Weeks 1-4.

Add activities that are specific to the final 2 phases in SDLC for deployment and ongoing maintenance and support.

Solution Preview :

Prepared by a verified Expert
Management Information Sys: System and application overview an overview of the system
Reference No:- TGS02572683

Now Priced at $50 (50% Discount)

Recommended (91%)

Rated (4.3/5)