Flexible budget for factory overhead:

Presented below are the monthly factory overhead cost budget (at normal capacity of 5,000 units or 20,000 direct labor hours) and the production and cost data for a month. The predetermined overhead rate is based on normal capacity.

Factory Overhead budget:

Fixed cost

 

 

Depreciation on building and machinery

$1,200

 

Taxes on building and machinery

500

 

Insurance on building and machinery

500

 

Superintendent's salary

1,500

 

Supervisors' salaries

2,300

 

Maintenance wages

1,000

7,000

  Variable cost

 

 

Repairs

$400

 

Maintenance supplies

300

 

Other supplies

200

 

Payroll taxes

800

 

Small tools

300

2,000

Total standard factory overhead

 

$9,000

Required:

1. Assuming that variable costs will vary in direct proportion to the change in volume, prepare a flexible budget for production levels of 80%, 90%, and 110% of normal capacity. Also determine the rate of application of factory overhead to work in process at each level of volume in both units and direct labor hours.

2. Prepare a flexible budget for production levels of 80%, 90%, and 110%, assuming that variable costs will vary in direct proportions to the change in volume, but with the following exceptions. (Hint: Set up a third category for semifixed expenses.)

a. At 110% of capacity, an assistant department head will be needed at a salary of $10,500 annually.

b. At 80% of capacity, the repairs expense will drop to one-half of the amount at 100% capacity. (At other levels it is perfectly variable.)

c. Maintenance supplies expense will remain constant at all levels of production.

d. At 80% of capacity, one part-time maintenance worker, earning $6,000 a year, will be laid off.

e. At 110% of capacity, a machine not normally in use and on which no depreciation is normally recorded will be used in production. Its cost was $12,000, it has a ten-year life, and straight-line depreciation will be taken.

Solution Preview :

Prepared by a verified Expert
Accounting Basics: Prepare a flexible budget for production levels
Reference No:- TGS01620830

Now Priced at $25 (50% Discount)

Recommended (98%)

Rated (4.3/5)