Performing the drilling operations


Assignment:

Write the APT part program to perform the drilling operations for the part drawing in Figure. Use the TURRET command to call the different drills required. Cutting speed = 0.4 m/sec, feed = 0.10 mm/rev, and table travel speed between holes = 500 mm/min. Post processor call statement is MACHIN/TURDRL,02.

1683_drilling operations.JPG

Provide complete and step by step solution for the question and show calculations and use formulas.

Request for Solution File

Ask an Expert for Answer!!
Engineering Mathematics: Performing the drilling operations
Reference No:- TGS01979281

Expected delivery within 24 Hours