Question: MANUFACTURING PRODUCTION SCHEDULE Ace Novelty manufactures "Giant Pandas," "Saint Bernards," and "Big Birds." Each Panda requires 1.5 yd2 of plush, 30 ft3 of stuffing, and 5 pieces of trim; each Saint Bernard requires 2 yd2 of plush, 35 ft3 of stuffing, and 8 pieces of trim; and each Big Bird requires 2.5 yd2 of plush, 25 ft3 of stuffing, and 15 pieces of trim. If 4700 yd2 of plush, 65,000 ft3 of stuffing, and 23,400 pieces of trim are available, how many of each of the stuffed animals should the company manufacture if all the material is to be used? Give two specific options.