How would you assess p-two-ps effort at introducing scrum


Assignment

After reading case study 15.1(page 608 text book page 586) answer Part 1 and Part 2 questions.

Text Book: Project Management- The Managerial Process by Erik W. Larson and Clifford F. Gray, Eighth Edition.

PART 1

• How well is Scrum working?
• What are the issues confronting the Big Foot project?
• Assume you are Kendra. What would you want to say at the retrospective? How would you say it?
• What improvements or changes need to be made?

PART 2

• How would you assess P2P's effort at introducing Scrum?
• What challenges does an organization face when adopting an Agile approach like Scrum?
• What could P2P have done to enhance success?

Format your assignment according to the give formatting requirements:

• The answer must be using Times New Roman font (size 12), double spaced, typed, with one-inch margins on all sides.

• The response also includes a cover page containing the student's name, the title of the assignment, the course title, and the date. The cover page is not included in the required page length.

• Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Business Management: How would you assess p-two-ps effort at introducing scrum
Reference No:- TGS03076893

Now Priced at $30 (50% Discount)

Recommended (91%)

Rated (4.3/5)