How much total overhead cost is expected


How much total overhead cost is expected to be allocated to unframed, steel, and wood frames?

Unframed prints 80,000 units direct material print $12.

Steel framed 15,000 units direct material print $16. Frame $4.

Wood frame 7,000 units direct material print $20 frame $6 Matt

Direct labor

Unframed picking rate/ hour $12. picking time 10 min
Steel frame picking rate/ hour $12 picking time 10 min
Wood frame picking rate/hour $12 picking time 10 min
Steel matting & framing rate/hour $21 20 min
Wood matting & framing rate/hour $21 30 min

375,000 manufactured overhead cost

Solution Preview :

Prepared by a verified Expert
Accounting Basics: How much total overhead cost is expected
Reference No:- TGS01620871

Now Priced at $20 (50% Discount)

Recommended (99%)

Rated (4.3/5)