How can a contractor verify that the desired alignment and


Question: 1. How can a contractor verify that the desired alignment and depth are being maintained while performing horizontal earth boring?

2. Estimate the time required to load 400 cu yd (306 ni3) of gravel into trucks using a clamshell having a heaped bucket capacity of 1 cu yd (0.75 m3). Estimated cycle time is 25s. Job efficiency is estimated to be 80%.

Request for Solution File

Ask an Expert for Answer!!
Finance Basics: How can a contractor verify that the desired alignment and
Reference No:- TGS02273728

Expected delivery within 24 Hours