Greenville cabinets received a contract to produce speaker


Greenville Cabinets received a contract to produce speaker cabinets for a major speaker manufacturer. The contract calls for the production of 3,300 bookshelf speakers and 4,100 floor speakers over the next two months, with the following delivery schedule: Model Month 1 Month 2 Bookshelf 2,100 1,200 Floor 1,500 2,600 Greenville estimates that the production time for each bookshelf model is 0.7 hour and the production time for each floor model is 1 hour. The raw material costs are $10 for each bookshelf model and $12 for each floor model. Labor costs are $22 per hour using regular production time and $33 using overtime. Greenville has up to 2,400 hours of regular production time available each month and up to 1,000 additional hours of overtime available each month. If production for either cabinet exceeds demand in month 1, the cabinets can be stored at a cost of $5 per cabinet. For each product, determine the number of units that should be manufactured each month on regular time and on overtime to minimize total production and storage costs. If required, round your answers to the nearest whole number. Regular Time Manufacture Model Month 1 Month 2 Bookshelf Floor Overtime Manufacture Model Month 1 Month 2 Bookshelf Floor

Request for Solution File

Ask an Expert for Answer!!
Operation Management: Greenville cabinets received a contract to produce speaker
Reference No:- TGS01529393

Expected delivery within 24 Hours