For 129 consecutive days a process engineer has measured


For 129 consecutive days, a process engineer has measured the temperature of champagne bottles as they are made ready for serving. Each day, she took a sample of 9 bottles. The average across all 1161 bottles (129 days, 9 bottles per day) was 59 degrees Fahrenheit. The standard deviation across all bottles was 1.1 degree. When constructing an X-bar chart, what would be the upper control limit?