Evaluate application of project management techniques in


Assignment Objectives

Assess the general functions of management as depicted by planning, organizing, leading, and controlling

Assignment Description

McGee Carpet and Trim installs carpets in commercial offices. Andrea McGee has been very concerned with the amount of time it took to complete several recent jobs. Some of her workers are very unreliable. A list of activities and their optimistic completion time, the most likely completion time, and the pessimistic completion time (all in days) for a new contract are provided in a given table. Following are the activities that are required to install the carpets in the offices:

You must also do the following:

Determine the expected completion time and the variance for each activity

Determine the total project completion time and the critical path for the project

Determine Early Start (ES), Early Finish (EF), Late Start (LS), and slack for each activity

What is the probability that McGee Carpet and Trim will finish the project in 40 days or less?

Define project management and the necessary requirements.

Analyze implications of changes in project scheduling.

Evaluate application of project management techniques in terms of the firm's business operational goals and requirements.

Please submit your assignment in an APA-formatted paper.

Submitting your assignment in APA format means, at a minimum, you will need the following:

Title page: Remember the running head. The title should be in all capitals.

Body: The body of your paper begins on the page following the title page and abstract page and must be double-spaced (be careful not to triple- or quadruple-space between paragraphs). The type face should be 12-pt. Times Roman or 12-pt.

Courier in regular black type. Do not use color, bold type, or italics except as required for APA-level headings and references. The deliverable length of the body of your paper for this assignment is 2-3 pages.

In-body academic citations to support your decisions and analysis are required. A variety of academic sources is encouraged.

Solution Preview :

Prepared by a verified Expert
Project Management: Evaluate application of project management techniques in
Reference No:- TGS02633835

Now Priced at $50 (50% Discount)

Recommended (93%)

Rated (4.5/5)