Estimate the maximum subsidence


Discussion:

A solution mine for nacholite that is processed into soda ash is developed by wells 549 m below the surface in the Piceance basin of Colorado. The mine will produce about 1 million short tons per year initially. Assume the ?opay zone?? is 27 m thick, dips 5? and that dissolvable nacholite is 20% of the zone material, then (1) specify an appropriate subsidence factor and angle of draw; (2) estimate the maximum subsidence; (3) critical width; and (4) trough width at the time mining extends to the critical area limit.

Solution Preview :

Prepared by a verified Expert
Other Subject: Estimate the maximum subsidence
Reference No:- TGS02013816

Now Priced at $20 (50% Discount)

Recommended (94%)