Develop the items listed above for a case study there will


Assessment Title Controls

Task Description

Assignment Overview

This assessment item requires you to consider:-
•event-driven controls, and
•time-driven controls

you must then develop the items listed above for a case study. There will be a template supplied for each of the items above. This case studies will cover a project domains of Engineering and construction domain.

Your submission must meet the minimum requirements for the controls outlined in the PMBOK (2013) and conform to the progress and project control requirements outlined in Managing Successful Projects with PRINCE2 (2009).

You are encouraged to use assignment outputs that you may have developed from previous assignments.

Task
Your task is to consider the overview above and develop and complete the required items for case studies using the templates that will be supplied during the course.
You will be graded upon how well your submissions have been completed and reflect the case studies.

Purpose
The primary purpose of this assessment item is to help you to develop skills in the definition and development of event and time driven management processes.

The secondary purpose of this assignment is to give you the opportunity to consider progress and project control requirements within a project life cycle.

The assignment will also give you the opportunity to enhance your analysis and written communication skills; particularly in the areas of structured assignment writing.

Structure
Your submission should be made using the supplied template. You should complete all of the required parts in as complete manner as you deem appropriate.

Attachment is:

https://www.dropbox.com/s/libduhndb4ztdmk/1747801_1_Engineering-and-Construction.zip?dl=0

Request for Solution File

Ask an Expert for Answer!!
: Develop the items listed above for a case study there will
Reference No:- TGS01563225

Expected delivery within 24 Hours