Determine the quality percentages


A manufacturing facility processed 8 units total in one shift(8 hr) with 1 defective. The standard cycle time is 1 hr/unit and the operating time is 8 hr. The load time is 10 hr and the set up time is 2 hr. Determine the Quality %.