Determine the methods for estimating project costs


Homework: Top-Down and Bottom-Up Estimates

Length: 750 to 1050 words.

1. Explain the factors that determine how a company selects a project.

2. Differentiate between top-down and bottom-up estimates, including when each would be used.

3. Determine the methods for estimating project costs.

4. Explain the types of costs.

Format your homework according to the give formatting requirements:

1. The answer must be double spaced, typed, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the homework, the course title, the student's name, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: Determine the methods for estimating project costs
Reference No:- TGS03123930

Now Priced at $40 (50% Discount)

Recommended (98%)

Rated (4.3/5)