Assignment:
We are going to take the simple task of making cupcakes, break the work up into stations, calculate cycle times for each station, balance the work load between stations, and calculate the efficiency of the operation. The steps for the assignment are below.
- Design an assembly line to manufacture cupcakes from scratch.
- Balance the assembly line.
Your answer must be typed, double-spaced, Times New Roman font (size 12), one-inch margins on all sides, APA format and also include references.