Design activities start with an agreed-upon statement


Based upon the results of traffic-load forecasts, a state department of transportation has decided to proceed with the design and construction of a new highway. However, prior to starting design work, a funding proposal must be prepared that justifies the design and construction expense. If the proposal is approved, a detailed survey will be performed on the proposed right of way (ROW). After the survey is completed, ROW clearance activities will be performed that include utility relocation, easement acquisition, and environmental investigations and cleanup. Design activities generally proceed concurrently with the ROW clearance activities, and close communication between the two groups is essential.

Design activities start with an agreed-upon statement of project objectives. Subsequent activities include traffic management and safety planning, preliminary design, and final design. After design activities are completed, a formal request for construction funding is submitted, a project manager is selected, and a construction contractor is selected. Prepare a work breakdown structure (WBS) for this project with activities corresponding to a two-level task and subtask hierarchy. Number the WBS codes so that the level of each activity is clearly identified. Do not worry about indentation.

Request for Solution File

Ask an Expert for Answer!!
Other Subject: Design activities start with an agreed-upon statement
Reference No:- TGS0528099

Expected delivery within 24 Hours