Create a testing plan that includes unit integration and


You have finally reached the installation phase and there are a few criteria you need to address. You need a testing plan that includes unit integration and system testing. This is the time emphasize the importance of careful documentation. You also need to draft a message that explains the installation process and includes guidelines for all concerned. The last step this week is to draft a data conversion plan and a changeover method for TIMS. You need to design a plan for post-implementation review, including fact-gathering methods, topics to cover, the timing of the review, and who should perform it.

Please develop the following:

1. Create a testing plan that includes unit integration and system testing. Ensure the criteria is carefully documented.

2. Explain the installation process and include guidelines for all concerned.

3. Develop a data conversion plan and a changeover method for TIMS. Include the plan for post-implementation review, including fact-gathering methods, topics to cover, the timing of the review, and who should perform it.

Solution Preview :

Prepared by a verified Expert
Other Subject: Create a testing plan that includes unit integration and
Reference No:- TGS01222157

Now Priced at $30 (50% Discount)

Recommended (95%)

Rated (4.7/5)