Consider the system shown below the realibility of each


Explain your answer with the step

Consider the system shown below. The realibility of each process is listed at the top of the box. Components A and B are attached separately. Component C comes in a container (E) and has a backup (D). Component F is a backup if E fails. A, B, and E (or F) have to work in order for the system to work. Please round all percentages to 4 decimal places (e.g.,

a. What is the reliability of the system?

b. If $900 must be spent to fix a failed system, what is the expected failure cost of the system? Please round to the nearest dollar.

c. If an 80% reliable backup for component A could be included at a cost of $45, should it be included in the product? Why or why not?

Request for Solution File

Ask an Expert for Answer!!
Operation Management: Consider the system shown below the realibility of each
Reference No:- TGS02514312

Expected delivery within 24 Hours