Calculating theoretical minimum number of operators


Assignment:

You are assigned to redesign an existing assembly line into a cell. The sales history shows the demand for the product to be 960 units per day. Your cell is intended to operate 16 hours per day. The task times (seconds) and precedence are shown below.

  • Determine Takt Time
  • Calculate the theoretical minimum number of operators.
  • Create a balance chart showing each operator and the tasks assigned to each person.
  • Make an outline of the cell layout indicating what tasks are assigned to each workstation. Only assign one workstation to each person.
  • How much time would need to be eliminated to remove a person from the operation?

Your answer must be typed, double-spaced, Times New Roman font (size 12), one-inch margins on all sides, APA format and also include references.

Request for Solution File

Ask an Expert for Answer!!
Operation Management: Calculating theoretical minimum number of operators
Reference No:- TGS01993688

Expected delivery within 24 Hours