Calculate the direct cost of proposed earthmoving operation


Problem

A CAT D7H (power-shift) dozer is used in a pushing operation. The dozer is equipped with a straight blade. The material (dry and noncohesive) weighs 106 pcf in the bank state. It is estimated that the material will swell 7%, from bank to loose state. The center-of-mass-to-center-of-mass pushing distance is 300 ft downhill on a 3% grad& The operators have average skill and the job will be performed in dusty conditions. lob efficiency can be assumed to be equivalent to a 45-min hour. Calculate the direct cost of the proposed earthmoving operation in dollars per bcy. The company's normal O&O cost for these machines is S70 per hour and the operator's wage is 51218 per hour plus 41% for fringes, insurance, worker's compensation, and soon.

The response should include a reference list. Double-space, using Times New Roman 12 pnt font, one-inch margins, and APA style of writing and citations.

Solution Preview :

Prepared by a verified Expert
Macroeconomics: Calculate the direct cost of proposed earthmoving operation
Reference No:- TGS02096759

Now Priced at $15 (50% Discount)

Recommended (97%)

Rated (4.9/5)