Calculate the direct cost of proposed canlimoving operation


Problem

A CAT 834 with a straight blade is to be used to push a material that Weighs 110 pcf in the bank state. It is estimated that the material will swell 9%, from the bank to loose state. This cohesive soil is to be moved an average distance of 250 ft on a 0% grade. The operator is a new hire with average skill. Job efficiency is estimated to be equivalent to a 50-min hour. Assume that the dozer will have a 0.38 coefficient of traction. Calculate the direct cost of the proposed canlimoving operation in dollars Per bey. The (O&O) cost for the dozer is 568 per hour and the operator's wage is 58,76 Der hour olus 34% for fringes, insurance, worker's.

The response should include a reference list. Double-space, using Times New Roman 12 pnt font, one-inch margins, and APA style of writing and citations.

Solution Preview :

Prepared by a verified Expert
Macroeconomics: Calculate the direct cost of proposed canlimoving operation
Reference No:- TGS02096760

Now Priced at $15 (50% Discount)

Recommended (98%)

Rated (4.3/5)