Average setup time on a certain production machine is 40


Average setup time on a certain production machine is 4.0 hours. Average batch size is 48 parts, and average operation cycle time is 4.2 min. The reliability of this machine is characterized by mean time between failures of 37 hours and a mean time to repair of 55 min.

(a) If availability is ignored, what is the average hourly production rate of the machine?

(b) Taking into account the availability of machine, determine its average hourly production rate?

(c) Suppose that availability only applied during the actual run time of the machine and not the setup time. Determine the average hourly production rate of the machine under this scenario?

Request for Solution File

Ask an Expert for Answer!!
Operation Management: Average setup time on a certain production machine is 40
Reference No:- TGS01140415

Expected delivery within 24 Hours