Assessment of a high temperature steam header piping


Assignment Project - Life assessment of high temperature header piping and tube system

The project aims for a life assessment of a high temperature steam header piping and tube system at a power generation plant. The client has requested a life assessment to be performed on one of their super heater header, as shown in Figure 2.1, which is a central manifold for other piping runs that is used to convert saturated or wet steam into superheated or dry steam.

The plant is considering changing its operation mode to a two-shifting mode. Where the plant will be shut down over the weekend (Friday night at 8pm) and restarts the operation back on Monday at 8am. The header has experienced some 82000 hours operation already.

Using pressure vessel design codes such as the EN12952 or ASME 831.1, estimate the remaining fatigue and creep life of a header with a stub configuration, as shown in Figure 2.2 if the two-shifting mode is to be run. They would also like to understand the geometrical effects of a row of tubes/stubs on the stress in the header and to estimate the fatigue and creep life of the header. These effects are taken into account through the parameter VL called ligament efficiency. The main dimensions of the component and operating conditions are reported in Table 1.

The owner of the plant welcomes recommendations with respect to header maintenance following the proposed change in operation as well as improvements in the design, optimisation of materials and manufacturing of the steam header piping and tubing.

Fig. 2.1. (a) A superheater header being manufactured (b) the geometry of the header with tubes.

677_Superheater.jpg

Table 1: Nominal dimensions & Operating conditions

Material

Header

21/4CrMo

Tube

(P22)

Geometry

Header outer diameter D., mm

390

Header thickness, tmm

56

Tube stub outer diameter d., mm

57

Tube thickness 1., mm

9

Pitch between tube holes L1, mm

336

Pitch between tube holes L2, mm

400

Operating condition

Pressure P, MPa

14

Temperature T, °C

565

Total in-service time, hrs

82000

Literature review (including review on methods and data search, references to standards/codes)

Quantitative (analytical and/or numerical) analysis including evidence of work, the justifications and the discussion

Conclusion and Recommendation (consideration can be on the Materials, Manufacturing, Design, Operation and/or Maintenance)

Report presentation & quality

Request for Solution File

Ask an Expert for Answer!!
Mechanical Engineering: Assessment of a high temperature steam header piping
Reference No:- TGS03050110

Expected delivery within 24 Hours