A production line is to be designed for a job with three


A production line is to be designed for a job with three tasks. The task times are 0.7 minutes, 0.9 minutes, and 0.3 minutes. The maximum cycle time in minutes is:

1) A production line is to be designed for a job with three tasks. The task times are 0.6 minutes, 1.0 minutes, and 1.1 minutes. The minimum cycle time in minutes is:

2) A production line is to be designed for a job with three tasks. The task times are 0.6 minutes, 0.9 minutes, and 1.4 minutes.

3) The Production Line is in operation for 8.5 hours per day. Desired output is 260 units per day. To achieve this level of output the Cycle time in minutes is: