A product whose work content time 475 min is to be


A product whose work content time = 47.5 min is to be assembled on a manual production line. The required production rate is 30 units per hour. From previous experience, it is estimated that the manning level will be 1.25, proportion uptime = 0.95, and repositioning time = 6 sec. Determine (a) ideal minimum number of workers required on the line. (b) how many workstations would be needed?