A loan processing operation that processes an average of 7


Determine the utilization and the efficiency for each of these situations:

A loan processing operation that processes an average of 7 loans per day. The operation has a design capacity of 10 loans per day and an effective capacity of 8 loans per day.

A furnace repair team that services an average of four furnaces a day if the design capacity is six furnaces a day and the effective capacity is five furnaces a day.

Would you say that systems that have higher efficiency ratios than other systems will always have higher utilization ratios than those other systems? Explain.