Introduction to Preventive Maintenance Schedule
Preventive maintenance is the maintenance that has to be performed to the equipment, in a pre designed way before severe breakdown occurs. If a record is kept for specific measurable parameters such as body and bearing temperature, insulation resistance, earth resistance etc., it is feasible from the scrutiny of this record to calculate the occurrence of future trouble and essential steps can be taken to avoid the occurrence of severe breakdown.
The interval of doing several maintenance operations relies on the type of equipment, ambient condition and other issues. It is hard to lay down hard and fast rules that covering all circumstances but for average normal industrial duty with in the mentioned time schedule will provide as guide. This can be customized to suit other conditions at site.
Daily maintenance:
A.) Check visually earth connections and motor leads.
B.) Test motor windings for overheating.
C.) Check control equipment.
D.) Test condition of bearings.
F.) Add oil, if essential,
G.) Test end play.
Weekly maintenance:
A.) Test belt tension. In the case of sleeve bearing machines the air gap among the rotor and stator should be checked.
B.) Blow out dirt from the protected type motors' windings situated in dusty locations.
C.) Check starting equipment for burnt contacts in which motor is started and stopped frequently.
D.) Check oil in the case of oil ring lubricated bearings for contamination through dust, grit etc. (this can be approximately judged from the colour of the oil).
E.) Test the intensity of vibrations throughout operation of the motor.
F.) Clean filters in which provided.
Monthly maintenance:
A.) Overhaul controllers.
B.) Examine and clean oil circuit breakers.
C.) Renew oil in high speed bearings in damp and dusty locations.
D.) Wipe brush holders and test bedding of brushes of slip-ring motors.
E.) Test that the connections of temperature detectors and space heaters, in which provided, are proper and these are in working order.
Half-Yearly Maintenance:
A.) Clean windings of motors subjected to corrosive or other elements as well bake and varnish them, if essential.
B.) In the case of slip-ring motors, test the slip-rings for grooving or unusual wear.
C.) Test grease in ball and roller bearings and make it up where necessary taking care to avoid overfilling.
D.) Drain all oil bearings; wash along with petrol to which a few drops of oil have been added, flush with lubricating oil and refill with clean oil.
Annual Maintenance
A. Test all high speed bearings and renew, if essential.
B. Blow out all motor windings carefully with clean dry air. Ensure that the pressure is not so high as to damage the insulation.
C. Clean and varnish dirty and oily windings.
D. Overhaul motors that have been subjected to severe operating conditions.
E. Renew switch and fuse contacts if damaged.
F. Test oil for its dielectric strength.
G. Renew oil in starters subjected to damp or corrosive elements.
H. Test insulation resistance to earth and among the phases of motor windings, control gear and wiring.
I. Test resistance of earth connections.
J. Test air gaps.
K. Test condition of all fasteners.
Latest technology based Electrical Engineering Online Tutoring Assistance
Tutors, at the www.tutorsglobe.com, take pledge to provide full satisfaction and assurance in Preventive Maintenance Schedule homework help via online tutoring. Students are getting 100% satisfaction by online tutors across the globe. Here you can get homework help for Preventive Maintenance Schedule, project ideas and tutorials. We provide email based Preventive Maintenance Schedule homework help. You can join us to ask queries 24x7 with live, experienced and qualified online tutors specialized in Preventive Maintenance Schedule. Through Online Tutoring, you would be able to complete your homework or assignments at your home. Tutors at the TutorsGlobe are committed to provide the best quality online tutoring assistance for Electrical Engineering homework help and assignment help services. They use their experience, as they have solved thousands of the Electrical Engineering assignments, which may help you to solve your complex issues of Preventive Maintenance Schedule. TutorsGlobe assure for the best quality compliance to your homework. Compromise with quality is not in our dictionary. If we feel that we are not able to provide the homework help as per the deadline or given instruction by the student, we refund the money of the student without any delay.
construction of audio amplifier using tba 810 ic - assemble the circuit with the provided components.
vacuum impregnation is extremely identical to the hot dip method but is much well-organized.
Photosynthesis-Basic Issues tutorial all along with the key concepts of Introduction to Photosynthesis, Elucidation of Photosynthesis, The Nature of Light
The objectives of inter-firm comparison are: Each member-unit can try to enhance its efficiency while on comparison with other member-firms it comes to make out about its weak points.
tutorsglobe.com demand assignment help-homework help by online demand and supply tutors
tutorsglobe.com nitrate assimilation assignment help-homework help by online nitrogen cycle tutors
The weaknesses of univariate analysis have led researchers to build up models that combine ratios in such type of way like to generate a single index which can be interpreted more visibly.
Theories of Structure and Bonding tutorial all along with the key concepts of Valence bond theory, Crystal field theory, Octahedral field, Spectrochemical series, Factors affecting crystal field splitting
tutorsglobe.com haemocytometer assignment help-homework help by online medical lab methods tutors
magnetism of materials tutorial all along with the key concepts of response of different substances to a magnetic field, magnetic moment and angular momentum, diamagnetism and paramagnetism and larmor precession
Seedless plants and Spermatophytes tutorial all along with the key concepts of Division Bryophyta, Division Pteridophyta, The Spermatophytes and Division Angiospermae
Theory and lecture notes of Time Allocation, Labour Supply and Labour Markets all along with the key concepts of labour supply and labour markets, Time Allocation Budget Line, Budget constraint. Tutorsglobe offers homework help, assignment help and tutor’s assistance on Time Allocation, Labour Supply and Labour Markets.
tutorsglobe.com zinc carbonate assignment help-homework help by online compound tutors
To combine the transmitted RF waves and the receiver an instrument is essential. The received signal is processed to several actions and at last audio is obtained.
tutorsglobe.com waste management assignment help-homework help by online environmental science tutors
1964232
Questions Asked
3689
Tutors
1491498
Questions Answered
Start Excelling in your courses, Ask an Expert and get answers for your homework and assignments!!