Introduction to Preventive Maintenance Schedule
Preventive maintenance is the maintenance that has to be performed to the equipment, in a pre designed way before severe breakdown occurs. If a record is kept for specific measurable parameters such as body and bearing temperature, insulation resistance, earth resistance etc., it is feasible from the scrutiny of this record to calculate the occurrence of future trouble and essential steps can be taken to avoid the occurrence of severe breakdown.
The interval of doing several maintenance operations relies on the type of equipment, ambient condition and other issues. It is hard to lay down hard and fast rules that covering all circumstances but for average normal industrial duty with in the mentioned time schedule will provide as guide. This can be customized to suit other conditions at site.
Daily maintenance:
A.) Check visually earth connections and motor leads.
B.) Test motor windings for overheating.
C.) Check control equipment.
D.) Test condition of bearings.
F.) Add oil, if essential,
G.) Test end play.
Weekly maintenance:
A.) Test belt tension. In the case of sleeve bearing machines the air gap among the rotor and stator should be checked.
B.) Blow out dirt from the protected type motors' windings situated in dusty locations.
C.) Check starting equipment for burnt contacts in which motor is started and stopped frequently.
D.) Check oil in the case of oil ring lubricated bearings for contamination through dust, grit etc. (this can be approximately judged from the colour of the oil).
E.) Test the intensity of vibrations throughout operation of the motor.
F.) Clean filters in which provided.
Monthly maintenance:
A.) Overhaul controllers.
B.) Examine and clean oil circuit breakers.
C.) Renew oil in high speed bearings in damp and dusty locations.
D.) Wipe brush holders and test bedding of brushes of slip-ring motors.
E.) Test that the connections of temperature detectors and space heaters, in which provided, are proper and these are in working order.
Half-Yearly Maintenance:
A.) Clean windings of motors subjected to corrosive or other elements as well bake and varnish them, if essential.
B.) In the case of slip-ring motors, test the slip-rings for grooving or unusual wear.
C.) Test grease in ball and roller bearings and make it up where necessary taking care to avoid overfilling.
D.) Drain all oil bearings; wash along with petrol to which a few drops of oil have been added, flush with lubricating oil and refill with clean oil.
Annual Maintenance
A. Test all high speed bearings and renew, if essential.
B. Blow out all motor windings carefully with clean dry air. Ensure that the pressure is not so high as to damage the insulation.
C. Clean and varnish dirty and oily windings.
D. Overhaul motors that have been subjected to severe operating conditions.
E. Renew switch and fuse contacts if damaged.
F. Test oil for its dielectric strength.
G. Renew oil in starters subjected to damp or corrosive elements.
H. Test insulation resistance to earth and among the phases of motor windings, control gear and wiring.
I. Test resistance of earth connections.
J. Test air gaps.
K. Test condition of all fasteners.
Latest technology based Electrical Engineering Online Tutoring Assistance
Tutors, at the www.tutorsglobe.com, take pledge to provide full satisfaction and assurance in Preventive Maintenance Schedule homework help via online tutoring. Students are getting 100% satisfaction by online tutors across the globe. Here you can get homework help for Preventive Maintenance Schedule, project ideas and tutorials. We provide email based Preventive Maintenance Schedule homework help. You can join us to ask queries 24x7 with live, experienced and qualified online tutors specialized in Preventive Maintenance Schedule. Through Online Tutoring, you would be able to complete your homework or assignments at your home. Tutors at the TutorsGlobe are committed to provide the best quality online tutoring assistance for Electrical Engineering homework help and assignment help services. They use their experience, as they have solved thousands of the Electrical Engineering assignments, which may help you to solve your complex issues of Preventive Maintenance Schedule. TutorsGlobe assure for the best quality compliance to your homework. Compromise with quality is not in our dictionary. If we feel that we are not able to provide the homework help as per the deadline or given instruction by the student, we refund the money of the student without any delay.
A large range of products means much more investment in terms of equipment in both fixed and working capital and larger sales attempts that all push up the cost of production and sales.
tutorsglobe.com structure of a prokaryotic cell assignment help-homework help by online prokaryotes tutors
seeking for top-rated atomic physics assignment help for a++ grades? avail it from the qualified and skilled tutors!
fungi tutorial all along with the key concepts of structure of fungi, nutrition and growth of fungi, reproduction in fungi, fungi adaptation and economic significance of fungi
application and scope of managerial economics including the key concepts of managerial economics, average value, horizontal boundaries, marginal value, vertical boundaries, imperfect market, economic model, market power and stock
www.tutorsglobe.com offers compounds with several stereogenic centers homework help, compounds with several stereogenic centers assignment help, online tutoring assistance, organic chemistry solutions by online qualified tutor's help.
The radar antenna or dish sends pulses of radio waves or microwaves that bounce off any object in their path.
www.tutorsglobe.com offers irreversible addition reactions homework help, irreversible addition reactions assignment help, online tutoring assistance, organic chemistry solutions by online qualified tutor's help.
Benzopyridines tutorial all along with the key concepts of Quinoline, Skraup Synthesis, Friedlander Synthesis, Methylquinolines, Aminoquinolines, Conrad-Limpach-Knorr Synthesis, Isoquinoline, Bischler-Napieralski Synthesis and Pictet-Spengler Synthesis
tutorsglobe.com single cell protein assignment help-homework help by online biotechnology tutors
Steel bands are laced on the front and back ends of the coils. Steel bands are up on the armature in a dissimilar way than in the cord bands.
Theory and lecture notes of The QR Method all along with the key concepts of the qr method, linear algebra, assignment help, homework help. Tutorsglobe offers homework help, assignment help and tutor’s assistance on The QR Method.
TRF radio receiver is a straight radio receiver. It is termed as tuned radio frequency receiver.
tutorsglobe.com lens replacement assignment help-homework help by online receptor organs tutors
tutorsglobe.com muscle tone assignment help-homework help by online muscles tutors
1935577
Questions Asked
3689
Tutors
1489659
Questions Answered
Start Excelling in your courses, Ask an Expert and get answers for your homework and assignments!!