Load test on piles
What are the main reasons to carry out the pile load test?
Expert
Load test on piles:
The main reasons to carry out the pile load test consists of:
a. In order to design other piles obtaining of back- figured data becomes easy.b. Calculation of overall cost involved in the work becomes easy due to knowledge of pile length.c. By using the pile driving and geotechnical formula the results can be counter checked.d. Structural soundness of the pile can also be checked.
Test loading:The four types of tests which are usually carried out on the piles are-
Why total settlement and tilt settlement can be critical considerations in damaging buildings?
Describe the rationales of Observational Method in geotechnical works?
Write about the advantages of a Diesel Power Plant?
Explain the mechanism in the formation of Frost Heave?
List the advantages of Multistage Compression over Single Stage Compression?
Students form a group and then choose 10 ha area for designing. The subdivision chosen must be a vacant land which needs to be developed and must be located within Australia. Students are required to use Micro station , MX Road , Google Earth and CIRCLY design software to complete the project. The p
Write a brief notes on Prismatic compass and Surveyor’s compass.
Write about the various disposal methods used for disposing solid, liquid and gaseous waste from power plants?
Explain the single plane or multiple planes use in cable-stayed bridges?
There are three questions. Total word range of 2500-3000 words.
18,76,764
1937244 Asked
3,689
Active Tutors
1452153
Questions Answered
Start Excelling in your courses, Ask an Expert and get answers for your homework and assignments!!