What are the main reasons to carry out the pile load test?
Expert
Load test on piles:
The main reasons to carry out the pile load test consists of:
a. In order to design other piles obtaining of back- figured data becomes easy.b. Calculation of overall cost involved in the work becomes easy due to knowledge of pile length.c. By using the pile driving and geotechnical formula the results can be counter checked.d. Structural soundness of the pile can also be checked.
Test loading:The four types of tests which are usually carried out on the piles are-
Gravity flow: Gravity flow is a fluid flowing due to the forces of gravity alone and not to the applied pressure head. In Bernoulli’s equation, the pressure word is absent, and the height and velocity terms are only ones involved.
How the surveying is being categorized on the basis of the instruments used?
Write a brief note on Fly Levelling.
How do vortex-induced vibrations affect the stability of long bridges?
Define the term below: a) Whole circle bearing. b) Reduced bearing.
Why is spalling reinforcement essential for pre-stressing works in anchor blocks?
Write short note on Supersaturated Flow on steam nozzles.
Write a brief notes on Gas Turbines.
Explain EC engines with an example.
Describe the different methods of direct measurement.
18,76,764
1961288 Asked
3,689
Active Tutors
1460927
Questions Answered
Start Excelling in your courses, Ask an Expert and get answers for your homework and assignments!!