Load test on piles:
The main reasons to carry out the pile load test consists of:
a. In order to design other piles obtaining of back- figured data becomes easy.b. Calculation of overall cost involved in the work becomes easy due to knowledge of pile length.c. By using the pile driving and geotechnical formula the results can be counter checked.d. Structural soundness of the pile can also be checked.
Test loading:The four types of tests which are usually carried out on the piles are-
What is by Forced Circulation Boiler? What is the pressure at which the modern high pressure boilers produce steam?
When should engineers use jacking at one end only and from both ends in pre-stressing work?
What are the characteristics of Vierendeel girder?
Write down the basic requirements of the fuel injection system of Diesel Engine.
List applications of Centrifugal Pump?
Why should not raking piles of a bridge abutment to be placed under an embankment?
List the demerits of a Nuclear Power Plant.
Describe the different methods of direct measurement.
Why total settlement and tilt settlement can be critical considerations in damaging buildings?
Are bored piles the most commonly used type of concrete pile in the United States? What are its usage statistics? Please include any useful sources and thank you!
18,76,764
1959112 Asked
3,689
Active Tutors
1414682
Questions Answered
Start Excelling in your courses, Ask an Expert and get answers for your homework and assignments!!