Load test on piles:
The main reasons to carry out the pile load test consists of:
a. In order to design other piles obtaining of back- figured data becomes easy.b. Calculation of overall cost involved in the work becomes easy due to knowledge of pile length.c. By using the pile driving and geotechnical formula the results can be counter checked.d. Structural soundness of the pile can also be checked.
Test loading:The four types of tests which are usually carried out on the piles are-
Meaning of soil reinforcement: Soil reinforcement is the action of enhancing soil strength to allow it support or carry more loads. Two general illustrations are: a) Mixing a so
Write differences between single acting reciprocating pump and double acting reciprocating pump.
What is Scavenging?
Write short note on Cavitation.
Explain Relative Humidity and Wet bulb temperature.
Define Air Standard and Relative Efficiency.
Advancements in civil engineering: Dissimilar other fields of engineering, the major advancement of the filed have been in the early years of the century prior to the last century where the utilization of concrete technology is highly developed. The u
make sure follow the marking criteria and guide lines
Explain the effects of friction on the flow through a steam nozzle?
Whether sheets or geo-grids can replace reinforcing elements in soil nails?
18,76,764
1960058 Asked
3,689
Active Tutors
1418258
Questions Answered
Start Excelling in your courses, Ask an Expert and get answers for your homework and assignments!!