Working Principle of Hydroelectric Power Plant
State the working principle of Hydroelectric Power Plant.
Expert
Working principle is as follows:
Hydroelectric Power Plant consumes the potential energy of water when it is stored in a dam built over the river. This potential energy gets converted into the kinetic energy by passing it through a pipe known as penstock. The kinetic energy of water gets converted into mechanical energy in a water turbine.
Write down the various classification of Land Surveying.
Write down the various classifications of the Power Plants?
Explain the single plane or multiple planes use in cable-stayed bridges?
What are the advantages of Centrifugal Pump?
Name all the classification of hand moulding and explain them?
List the merits and demerits of Gas Turbines.
Average density of soil: For the aims of civil engineering, an average soil will have a density of around 100 to 110 pounds per cubic foot. (This can differ a little depending on how well compacted the soil is).
Write a brief notes on Prismatic compass and Surveyor’s compass.
Define the term surveying.
plss make sure u choose a vacant place in new south wales. and pls confirm with the tutuor wether he has access to all softwares . bcos i dont want u saying tht u dont have software at last minute .
18,76,764
1940168 Asked
3,689
Active Tutors
1413219
Questions Answered
Start Excelling in your courses, Ask an Expert and get answers for your homework and assignments!!