Evaluate performance of the repair-maintenance department


Problem:

I need to document a flowchart for a repair/maintenance service request and the repair manitenance work order should be corrinated and used among the departments of dinteman company to request and complete the repair and maintenance work, to provide the basis for charging the production departments for the cost of the completed work and to evaluate the performance of the repair and maintenance department. Provide explanations in the flowchart as appropriate (CMA adepted)

The Dinteman Company is an industrial machinery and equipment manufacturer with several production departments. The company employs automated and heavy equipment in its production departments. Consequently. Dinteman has a large repair and maintenance department (R&M department) for servicing this equipment.

The operating efficiency of the R&M department has deteriorated over the past two years. For example. repair and maintenance costs seem to be climbing more rapidly than other department costs. The assistant controller has reviewed the operations of the R&M department and has concluded that the administrative procedures used since the early days of the department are outmoded due in part to the growth of the com-pany. In the opinion of the assistant controller, the two major causes for the deteriom don are an antiquated scheduling system for repair and maintenance work, and the ac-tual cost to distribute the R&M departments costs to the production clerk-diluents. The actual costs of the R&M department are allocated monthly to the production depart-ments on the basis of the number of service calls made during each month.

The assistant controller has proposed that a formal work order system be imple-mented for the R&M department. With the new system, the production departments will submit a service request to the R&M department for the repairs and/or to be completed.including a suggested time for having the work done. The su¬pervisor of the R&M department will prepare a cost estimate on the service request for the work required (labor and materials) and estimate the amount of time for completing the work on the service request. The R&M supervisor will return the request to the production department that initiated the request. Once the production depart¬ment approves the work by returning a copy of the service request. the R&M supervisor will prepare a repair and maintenance work order and schedule the job. This work order provides the repair worker with the details of the work to be done and is used to record the actual repair and maintenance hours worked and the materials and supplies used.

Production departments will be charged for actual labor hours worked at a prede-termined standard rate for the type of work required. The parts and supplies used will be charged to the production departments at cost. The assistant controller believes that only two documents will be required in this new system—a Repair/Maintenance Service Request initiated by the production departments and a Repair/Main. tenance Work Order Initiated by the R&M department.

Solution Preview :

Prepared by a verified Expert
Project Management: Evaluate performance of the repair-maintenance department
Reference No:- TGS01769810

Now Priced at $25 (50% Discount)

Recommended (98%)

Rated (4.3/5)