"Steering Future Performance Back Toward the Baseline"  Please respond to the following:

  • Your construction project (the Ravens / Redskins football stadium from Week 6) is behind schedule and over budget. Proposed what you failed to do as a PM that led to this situation.   
  • From the e-Activity, determine at least two (2) best practices for getting your project back on track (e.g., steering future performance back toward the baseline.
  • Locate an article from Strayer's electronic library or via the Internet that supports your stance.