Why is planning for overtime effort an unacceptable option


Assignment

1. Conduct a brainstorming exercise to develop 10 operational features and 5 quality attributes for an HCU.

2. Identify three kinds of stakeholders for a Home Control Unit and briefly describe how they would interact with, or be affected by, individual HCUs and introduction of HCUs into the local community.

3. State five operational requirements for an HCU that would always be design goals; that is to say, it is not likely they could be, or would be, converted into technical specifi cations.

4. What risk factors are created if a project does not have a written project plan?

5. Briefly describe the ways in which each of the following provides a basis for project planning:

a. operational requirements
b. software specifi cations
c. process constraints
d. product constraints

6. Why is planning for overtime effort an unacceptable option in a project plan?

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: Why is planning for overtime effort an unacceptable option
Reference No:- TGS02986150

Now Priced at $30 (50% Discount)

Recommended (98%)

Rated (4.3/5)