Why is backward scheduling more widely used


Problem

Visualize the concept of backward scheduling (as shown in the lecture). Why is backward scheduling more widely used and better (in most cases) than forward scheduling? What does backward scheduling mean?

Request for Solution File

Ask an Expert for Answer!!
Operating System: Why is backward scheduling more widely used
Reference No:- TGS03222441

Expected delivery within 24 Hours