Who needs to be involved in the change process


Assignment: Implement & Measure Results

Because of a lack of time, you will not be able to fully implement your change project. However, consider how you would implement the project and how you would measure the results. In two- to three pages, discuss the following:

• Implementation

o Who needs to be involved in the change process?

o Who has to approve the change?

o How does the plan get communicated to those affected by the change?

o Step-by-step process to implement the change from beginning to end (more detail than perhaps what was provided in the change theory discussion).

• Measuring results

o How will results be measured or data collected (survey, observation)?

o Validity/reliability of the pre- and post-assessment tool used for measuring intervention.

o What will you do with the results?

Format your assignment according to the following formatting requirements:

o The answer should be typed, using Times New Roman font (size 12), double spaced, with one-inch margins on all sides.

o The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

o Also include a reference page. The Citations and references must follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Other Subject: Who needs to be involved in the change process
Reference No:- TGS03151628

Now Priced at $40 (50% Discount)

Recommended (96%)

Rated (4.8/5)