What’s the C.O.P. for a 5-ton of gas fired (absorption) chiller uses 15 kw electric and 5 thermo gas?

What would be the advantage of using electric chiller and gas-fired chillers in combination? How would you sequence their operations?

How much chilled water would be required to reduce chiller load by 100 tons for a period of 5 hours? How much is for ice storage?